PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electrical lighting control boxes at the 2nd floor Facing East.jpg Installed exterior framing at the 1st floor Facing South.jpg Installing Fire Alarmn boxes at the 2nd floor Facing North.jpg Installing panel boards at the 1st floor Electrical Room Facing East.jpg Motorized damper controllers.jpg Block work at the detention cells divider wall Facing East.jpg
Previous pageNext page Installed exterior framing at the 1st floor Facing South
Installed exterior framing at the 1st floor Facing South